Monitoring of work of the aeration tanks of operating town treatment plants is done. Based on the obtained results a conclusion has been drawn that sewage water is improperly treated from ammonium nitrogen. The velocity of the aeration process, depending on the concentration of dissolved oxygen and ammonium nitrogen, is investigated. The obtained investigation data became the basis for modeling the aeration process in industrial conditions depending on the required initial concentration of ammonium nitrogen.
At present, the most widely used methods for wastewater treatment are based on biological processes. Among different configurations of biological treatment technologies the most applied one is the activated sludge process. Depending on treatment quality requirements the systems which are based on activated sludge can be designed to treat wastewater from either only organic pollutants or both organic pollutants and nutrients (nitrogen and phosphorus). Activated sludge process has the following advantages that are especially revealed in household sewage water treatment: their simple construction, reliable work (when treating stable, nontoxic, and moderately polluted sewage water), possibility of use for treatment of the sewage water of different composition, and so forth [
The treatment effectiveness in aerated tanks, state, and oxidizing ability of the active sludge are determined by certain conditions, namely, composition and properties of sewage water, hydrodynamic stirring conditions, correlation of the amount of supplied sewage and viable sludge, aeration strategy, temperature and active reaction of environment, availability of power supply elements, and presence of activators and inhibitors of the process [
One of the important parameters that significantly influence the effectiveness of treatment is the aeration system design and control. At the same time, aeration of wastewater requires significant energy input and is often one of the biggest constituents of the total energy need of a plant. While aeration need in systems working at low sludge retention time (SRT) and high organic loading is still rather low at about 0.5 g O2/g BOD removed due to higher yield and lower mineralization of influent organics, the activated sludge processes which achieve full nitrification require up to 2 g O2/g BOD removed [
Thus, the inadequate amount of air supplied into the zone of biological reactions with participation of microbiological associations of active sludge decreases the treatment efficiency. The excess of air does increases the effectiveness but causes a significant increase of the power consumption for aeration. To ensure the adequate treatment many plants are still operated with higher than necessary concentration of dissolved oxygen in the activated sludge basins.
Therefore, aeration system optimization can potentially result in significant treatment cost reduction. A large number of studies were dedicated to improving existing and developing new aeration strategies.
While change of aeration intensity by maintaining stable dissolved oxygen (DO) concentration is a standard practice nowadays [
The most advanced aeration strategies make use of one or several ammonium sensors to predict or verify the aeration requirement. In these systems ammonium content in inflow (in feedforward systems) or outflow (in feedback systems) controls the DO set-points in an activated sludge line [
This study aims at evaluation of ammonium-based aeration control system by determining the most important kinetic coefficients of nitrification process using real wastewater and biomass of Lviv wastewater treatment plant followed by a simulation study with a model, which uses the determined coefficients.
Two types of test were done in this part of the study in order to determine influence of ammonium and dissolved oxygen (DO) concentration on nitrification activity.
Investigations on ammonium concentration influence were made with application of the experimental setup presented in Figure
Experimental setup: 1: compressor; 2: rheometer; 3: bioreactor, 4: aeration diffuser; 5: pH/ISE/mB/°C-meter
Activated sludge collected at Lviv wastewater treatment plant #2 (WWTP 2) was then added to reach a desired mixed liquor suspended solids concentration. All the tests were performed at the MLSS concentration of 2 g/L. After that the concentration of ammonium was measured for 1 hour with every 10 min while the concentration of dissolved oxygen was kept constant at desired level. For each corresponding value of the dissolved oxygen concentration four batch experiments were performed with initial ammonium concentrations of about 30, 20, 10, and 5 mg/L. These experiments were carried out in order to determine the nitrification activity at different ammonium concentration in wastewater treatment system.
The air supply rate was measured by the rheometer RDS-6. The air was supplied by the Atman AT-8500 compressor.
The tests on DO influence were done using the same synthetic wastewater as with the tests described above. The wastewater was aerated to saturation with oxygen. Then activated sludge was added and the decrease of DO concentration in the test bottle mixed with a magnetic mixer was measured. The decrease of the DO concentration was recalculated for ammonium consumption and this data was used to calculate the activity at different DO concentrations.
The concentration of DO and ammonium was measured at all of the treatment trains of the plant and compared to the readings of the stationary treatment plant sensors and the results of oxygen measuring by Winkler’s method for certain samples in the outlet of the aeration tank, obtained in chemical-bacteriological laboratory of the wastewater treatment plant.
The biological step of the WWTP consists of 6 plug flow activated sludge basins and secondary clarification basins. Every activated sludge basin consists of three passes. DO measurement is carried out by the Endress+Hauser company equipment, namely, two gauges Oximax COS 41 located at the inlet of the second pass and the aeration tank outlet. The gauges were fixed stationarily and immersed at a depth of 50 cm and connected to recording devices Liquisys M COM 223/253. Except for the dissolved oxygen concentration the wastewater temperature is measured as well.
The obtained dependence of nitrification activity at different ammonium and dissolved oxygen concentration was used as a basis for the developed mathematical model of the process of ammonium oxidation in a conventional elemental cell of the wastewater treatment plant.
Dependence of the process velocity on the concentration of dissolved oxygen was described by the Monod equation [
In this case the dependence of the process velocity on ammonium nitrogen concentration was modeled as a first-order dependence with the
General equation of the process is written as [
The ammonium oxidation rate in the described model changes, respectively, to the variation of ammonium nitrogen concentration in municipal wastewater during a day. For modeling the dependence of ammonium nitrogen concentration at the reactor inlet was assumed in the form presented in Figure
Variation of the ammonium nitrogen concentration at the inlet of a wastewater treatment plant assumed in the model (the data is based on [
Modeling of the process according to (
Values of constants for calculation of air consumption.
Constant | Values |
---|---|
|
0.6 |
|
0.98 |
Temperature of water and air | 25°С |
Theoretical concentration of air saturation | 8.2 mg/L |
Reactor depth | 4 m |
Atmospheric pressure | 100 kPa |
Factor |
0.9 |
Aerators effectiveness | 30% |
Aeration process was modeled for three cases:
In all the cases the modeling process was realized for four types of aeration control: with constant value of dissolved oxygen at 1, 2, and 3 mg/L and variable value of dissolved oxygen, depending on the difference between the ammonium concentration in the reactor and the set-point. The DO set-points for the ammonium-based controlled strategy were optimized for every of the studied cases separately as described in Section
Concentration of dissolved oxygen (DO) was determined with the portable oxygen analyzer Hach
Results of monitoring the operation of Lviv treatment plant, WWTP 2, are presented in Table
Concentration of dissolved oxygen in aerated tanks of WWTP 2.
Measurement method | Aerated tanks | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Number 1 | Number 2 | Number 3 | Number 4 | Number 5 | Number 6 | |||||||
2nd pass | Outlet | 2nd pass | Outlet | 2nd pass | Outlet | 2nd pass | Outlet | 2nd pass | Outlet | 2nd pass | Outlet | |
Treatment plant sensor | 0.18 | 0.25 | 9.9 | 6.04 | 5.69 | 0.24 | 8.55 | 4.01 | 6.3 | 0.29 | 0.32 | 0.19 |
Oxygen analyzer data | 0.44 | 0.41 | 3.67 | 2.33 | 3.4 | 0.54 | 2.69 | 1.73 | 3.15 | 2.6 | 0.11 | 0.37 |
Laboratory measurement results | — | 0.96 | — | 3.12 | — | 2.24 | — | 1.68 | — | 2.56 | — | 0.37 |
Correlation of DO concentration measured by treatment plant sensors and the portable meter.
Correlation of the potentiodynamic measurement by the stationary probes and results of chemical-bacteriological laboratory.
The most probable explanation of this difference is the instability of readings of the treatment plant stationary device DO due to the following reasons: membranes in the Clark voltammetric gauges can be polluted with active sludge; penetration of air bubbles on the membrane can cause a sudden rise in the value of DO concentration and poor calibration.
Besides, the poor performance of the meters can be caused by membrane aging and rupture. In this case it is worth using modern DO optical gauges that have some advantage to compare with the Clark devices.
Results of laboratory investigations on evaluating the nitrification activity (expressed as mg N/g sludge per hour) with respect to DO concentration and ammonium nitrogen concentration are presented in Figures
Approximation of the nitrification rate, depending on dissolved oxygen concentration, using the Monod kinetics.
Approximation of the nitrification rate, depending on ammonium nitrogen concentration, using a linear dependence.
The dependence on oxygen concentration could be fitted well with the Monod equation (see (
Concerning the dependence of the process velocity on ammonium nitrogen concentration, in case of a perfect system, it should also follow the Monod kinetics. But in the real system with the dissolved oxygen consumption not only for ammonium ions oxidizing, but also for other oxidizing processes and with nitrogen concentration gradient in flocs the experimental points decline from the Monod dependence (see Figure
In the ammonium-based aeration control the DO was changed in steps based on the difference between the modeled ammonium concentration and ammonium set-point based on the defined steps as in Table
Change of DO concentration based on ammonium set-points.
Ammonium set-point, mg/L | 7.5 | 3.5 | 1.8 |
---|---|---|---|
Delta NH4 < | DO concentration | ||
|
3 | 3 | 3 |
|
2.2 | 2.5 | 2.5 |
|
1.7 | 1.9 | 1.9 |
|
1.2 | 1.2 | 1.2 |
0 | 0.8 | 0.8 | 0.8 |
0.25 | 0.7 | 0.7 | 0.7 |
0.5 | 0.6 | 0.6 | 0.6 |
0.75 | 0.5 | 0.5 | 0.5 |
1 | 0.4 | 0.4 | 0.4 |
1 | 0.3 | 0.3 | 0.3 |
The DO set-points were optimized for the three cases in order to get the lowest possible air consumption and at the same time have the average ammonium concentration in the outlet at approximately the same level as in the strategy with the stable DO concentration of 1 mg/L. The obtained DO set-points for the tree cases are the same for low ad medium content of ammonium in the bioreactor and are somewhat lower in the case of higher ammonium content.
Process modeled for high concentrations of ammonium nitrogen is presented in Figures
Summarized averaged values for high concentrations of ammonium nitrogen.
DO = 1 mg/L | DO = 2 mg/L | DO = 3 mg/L | Ammonium set-point = 7.5 mg/L | |
---|---|---|---|---|
Oxidized nitrogen, g N/d | 227 | 255 | 267 | 246 |
Nitrogen at the reactor outlet, g N/d | 220 | 191 | 180 | 200 |
Air consumption, m3/d | 21 | 27 | 33 | 27 |
Specific air consumption, m3/kg N | 93 | 106 | 123 | 110 |
Nitrification process at DO concentration equal to 1.
Nitrification process at DO concentration equal to 2.
Nitrification process at DO concentration equal to 3.
Nitrification process ammonium nitrogen set-point of 7.5 mg/L.
Summarized results of modeling for high concentrations of ammonium nitrogen.
The simulations showed that the variation in ammonium content is the highest when the DO concentration is high. Low DO values give lower effluent ammonium variations but also higher average ammonium content in the treated wastewater. Aeration is more efficient at lower DO content which gives lower specific aeration requirement.
Process modeled for high concentrations of ammonium nitrogen is presented in Figures
Summarized averaged values for low concentrations of ammonium nitrogen.
DO = 1 mg/L | DO = 2 mg/L | DO = 3 mg/L | Ammonium set-point = 3.5 mg/L | |
---|---|---|---|---|
Oxidized nitrogen, g N/d | 90 | 94 | 96 | 90 |
Nitrogen at the reactor outlet, g N/d | 22 | 18 | 16 | 22 |
Air consumption, m3/d | 8.3 | 10.0 | 11.8 | 8.6 |
Specific air consumption, m3/kg N | 93 | 106 | 123 | 95 |
Nitrification process for DO concentration equal to 1.
Nitrification process for DO concentration equal to 2.
Nitrification process for DO concentration equal to 3.
Nitrification process ammonium nitrogen set-point of 3.5 mg/L.
Summarized results of modeling for low concentrations of ammonium nitrogen.
Similar pattern of ammonium concentration was observed even in this case. Relative variation of ammonium concentration was the same as the previous case but the absolute values were lower which is due to lower bacterial activity at lower ammonium concentrations.
Process modeled for very low concentrations of ammonium nitrogen is presented in Figures
Summarized averaged values for very low concentrations of ammonium nitrogen.
DO = 1 mg/L | DO = 2 mg/L | DO = 3 mg/L | Ammonium set-point = 1.8 mg/L | |
---|---|---|---|---|
Oxidized nitrogen, g N/d | 6.0 | 4.8 | 4.3 | 6.0 |
Nitrogen at the reactor outlet, g N/d | 50 | 51 | 51 | 50 |
Air consumption, m3/d | 4.6 | 5.4 | 6.3 | 4.7 |
Specific air consumption, m3/kg N | 93 | 106 | 123 | 95 |
Nitrification process for DO concentration equal to 1.
Nitrification process for DO concentration equal to 2.
Nitrification process for DO concentration equal to 3.
Nitrification process ammonium nitrogen set-point of 1.8 mg/L.
Summarized results of modeling for very low concentrations of ammonium nitrogen.
The ammonium set-point was set to 1.8 mg/L in the ammonium-based aeration controller.
The results of this case were similar to the relations observed for the previous case. It confirmed that the ammonium control is effective in stabilizing the effluent ammonium concentration at all the required treatment levels.
The process of ammonium oxidation in a conventional cell of activated sludge was modeled. The modelling results show that the same nitrogen removal is reached with lower air consumption when a constant value of dissolved oxygen is maintained comparing to ammonium-based aeration control. However, in the control strategy with the stable DO one needs to predict the incoming load so that the right DO concentration could be chosen.
The results of modeling show that with the ammonium-based control the fluctuation of the outlet ammonium concentration is 2-3 times lower comparing to the stable DO strategy.
The use of ammonium concentration to control aeration allows DO content to change automatically and guarantees not only the required level of treatment but also a stable nitrogen concentration in the sewage water at the outlet of the aerator. Since even a short-term discharge with the increased concentration of ammonium can significantly affect the environment, such type of control provides the improvement of the level of environmental safety.
Analysis of the data of aeration tanks effectiveness monitoring at Lviv treatment plant showed that the operation of the aeration tanks at WWTP 2 is not effective enough and needs improvement. This improvement would include the change of the air supply strategy to the one where the control signal is formed based on the ammonium ions concentration and not on the DO concentration.
In order to quantify the effects of the new control system a mathematic model of an activated sludge reactor with nitrification process was developed based on the kinetic coefficients which were obtained experimentally. The model can predict the performance of a reactor at different inflow rates and incoming ammonium concentrations under different aeration strategies. The strategies include both stable DO level and stepwise regulation of the DO level based on the ammonium concentration. The developed model was tested and the results show that the ammonium-based control is superior to the control strategy with the stable DO concentration in terms of ammonium discharge fluctuations but has higher aeration requirement.
The authors declare that they have no competing interests.